Since 5 August 2025, ARERA Resolution 385/2025/R/eel (Italian Regulatory Authority for Energy, Networks and Environment) has come into force, introducing mandatory requirements for photovoltaic and wind power plants ≥100 kW connected to medium voltage, with the aim of making the National Electric System safer and more stable.
What has changed?
- Mandatory CCI: a Central Plant Controller is required for all plants ≥100 kW
- PF2 Function: control and limitation of power based on external commands
- End of GDPRO category: manual power reduction is no longer sufficient
- Available incentives: scalable contributions for required upgrades
TeamWare, part of COL GROUP, supplies certified CCIs compliant with ARERA resolutions and provides specialized technical support for complete plant adaptation.
CCI
Central Plant Controller
DIN-rail mounting – door-mounted aux. LV – 19” rack mounting
Functions
General Plant Controller and PowerMete
Optional PowerQuality module
Compliance
Compliant with CEI 0-16 standard: “Technical reference rules for the connection of active and passive users to HV and MV networks of electricity distribution companies”, Annexes O and T “Central Plant Controller”.
Compliant with ARERA Resolution 540/2021/R/eel: “Regulation of data exchange between Terna SpA, Distribution Companies, and Significant Grid Users for the purpose of operating the National Electric System safely.”
Compliant with ARERA Resolution 385/2025/R/eel: “Verification of compliance with modifications to Terna’s Grid Code Annex A.72 and definition of further actions for distributed generation plants to ensure the Safety of the National Electric System.”
Compliant with RSE Specification 12004159: “Technical-functional specifications for voltage quality monitoring equipment for MV networks.”
Compliant with CEI EN 61000-4-30 Ed. 3 for Class A instrumentation.
Application
Suitable for any configuration of the MV electrical system.
Primary Substation DSO Gate
Regulation of data exchange between TERNA SpA (TSO), DISTRIBUTION SYSTEM OPERATORS (DSO), and SIGNIFICANT GRID USERS (SGU) for the safe operation of the National Electric System
Device Functions
- Management of communications with CCI devices via Ethernet network and IEC 61850 “secured” protocol with certificate-based authentication.
- Bridge with DSO remote-control SCADA systems via Ethernet connection, using IEC 60870-5-104 protocol.
- NTP (Network Time Protocol) client for time synchronization.
- Communication with GPS device.
Communication with CCI
- Communication with CCI via IEC 61850 MMS protocol as defined in Annex O of CEI 0-16, in compliance with requirements.
- Recognition and validation of the authentication certificate for TLS communication between DSO-Gate and CCI.
- Management of communications with up to 10 CCI devices (recommended).
- Configuration of the number of CCI units to be managed and their operating parameters.